HL-Kattor.Heavy Duty Transportation Integrated Solution Provider

  • Project : Qiantang River Bridge
  • Service :
  • Date : 10 Jan, 2023
  • Status :

Project Description

The new Qiantang River Bridge is located at the downstream side of the second Qianjiang River Bridge, which is a key control project of the reconstruction project of the Hangzhou urban section of the Shanghai Hangzhou Ningbo Expressway. The span of the bridge is (73.4+122+4 × 240+122+73.4) m, with a total length of 1350.8m, of which the steel truss beam is 1348m long. The main beam is a catenary-type continuous steel truss beam structure with upper stiffening. It is arranged on a double deck. The upper layer is an eight-lane first-class highway, and the lower layer is a double-track light rail. The project was undertaken by the Zhejiang Jiaogong Group, and HL-Kattor was jointly responsible for the launching of steel truss beams.

HL-Kattor Industry Co.LTD also supplied equipment like:

20 sets of 350T dragging jacks

10 sets of hydraulic pump stations

10 sets of PCL sub-control systems 

1 set of general control system 

4 sets of 1000T vertical effect jacking systems

20 sets of 4 synchronous pump stations controlled by one control system 

24 sets of 250T Deviation controlling jack. 


Project Images

Go To Top
0.1164s