HL-Kattor.Heavy Duty Integrated Solution Provider

  • Project : Yibin Lingang Yangtze River Road Railway Bridge
  • Service :
  • Date : 10 Jan, 2023
  • Status :

Project Description

The Yibin Lingang Yangtze River Road Railway Bridge is 1742.1 meters long in total. In addition to serving as a river crossing channel between the Cuiping area on the south bank of Yibin and the port area on the north, it is a crucial control project for the Zigong Yibin Line of the South Sichuan Intercity Railway. Following completion and opening to traffic, the bridge serves as both a river crossing for the Chengdu Kunming High-Speed Railway and the Chongqing Kunming High-Speed Railway, which drives traffic in numerous cities along the route and promotes regional integration and growth.

The equipment supplied by HL-Kattor for this project are:

32 sets of 1000t Synchronous lifting and lowering system 

16 sets of Hydraulic pump stations and 16 sets of PLC control systems. 

8 sets of 600T Adjustable lowering beam jacks.


Project Images

Go To Top
0.1363s